Crank Case Strip Down

One of the reasons we have to dismantle the crank case is, we need to remove the sleeves, pistons and con rods as one unit, as the pistons are stuck in the sleeves. The condition of the sleeves below the pistons is in very good condition so they should push out with little effort.

15 dec 002

 

Removing the magnetos was straight forward

15 dec 004

 

Also remove the coupling shaft

15 dec 022

 

Starter removed, as you can see the internals of the engine is in very good condition.

15 dec 024 15 dec 026

 

Next job was to remove the Hobson Injection System. As Pete was away driving a A340-600 to Sydney and back I used the third member of the team to assist , Mr Engine Hoist.

15 dec 02915 dec 032

 

Next job was to remove the reduction gear, as per the manual a little tap with a hide hammer and it came off.

15 dec 030

 

The condition of the reduction gear is excellent , and turns freely for the first time in thirty five years or so.

15 dec 031

 

Next to come off was the reduction gear drive gear.

15 dec 034

 

Take off the locking ring.

15 dec 03515 dec 036

 

Then take of the left hand threaded lock nut (good job I read the manual!) then remove the gear with the inner race of the front cover.

Next we will remove the front cover to reveal the wonders of the Bristol Hercules engine, the timing gears.

17 dec 001

 

And in we go! Pete spent a good day in the workshop and stripped down the timing cover and gears.

17 dec 002 17 dec 003

 

The wonders of a Bristol Hercules, you can not stop admiring the mass of timing gears but in fact it is quite simple.

17 dec 005 17 dec 004

Next job was to strip down the gears. It says in the manual “Provide provision to catch the 74 needle rollers from each transfer gear” that is an under statement! as Pete found out! But they are all accounted for.

17 dec 006

 

All the gears off now, next job is to remove the front section of the crank case, this will allow us to split the front section of the crankshaft.

dec18 001dec18 002

The front casing removal was quite straight forward, just get ready to catch the rollers from the front casing bearing.

dec18 007 dec18 006

 

The next task is going to be a bit fiddly! we need to get the bolts out of the front part of the crank to allow us to remove the first row of con rods with the master rod, then we can remove the bottom pins from the master rod to release the rest of the cylinders.

dec18 004 dec18 005

 

First job undo the maneton bolts, using special tool FB.168782 or in our case a 3/4″ drive ratchet and a six foot scaffolding pole! they where FT or very tight!

dec 22 004

The rear  bolt of the front maneton came straight out, the problem with the front bolt  was that it fouled No.6 sleeve. First we undid all of the sleeve ball joints, which gave us about 10′ of rotation of the engine, this was still not quite enough for us to get the front bolt out.

So we had move No.6 sleeve down a bit to give us clearance. We mixed up our special brew of Forte Diesel Injector cleaner and Variable Vane Turbo Cleaner 50/50 mix and flooded the back of No.6 piston.

dec 22 015 

After a twelve hour soak, the special brew had worked its way through and was dripping out of the sleeve.

dec 22 013

Next we had to make up a puller to move the sleeve, we altered one of the cylinder removal tools by milling a slot in it to allow us to fit it at the base of the sleeve around the con rod.

dec 22 019dec 22 022

 

We then welded together some old puller legs to fit around the sleeve, inserted a plate on top of the piston along with the push jack. The hydraulic connection just happened to come out of one of the ports! That was lucky……

dec 22 024

 

We only needed to move the sleeve about 1.5″ down to give us clearance.

dec 22 020

 

With a bit of gentle heat from a heat gun it soon moved down.

 

dec 22 025 dec 22 026

With both maneton bolts removed, it was a fairly straight forward job to remove the front part of the crank. We then removed the front row master con rod and all of the slave rods as one unit, we then removed the circlips on the wrist pins and dismantled it.

dec 22 028

Next job make a crankshaft stand addition to our frame, this will allow us to rotate the engine unto the vertical position, this allow us to strip down the rear section of the engine, gearbox, supercharger and rear set of sleeves etc.

Leave a Reply

Your email address will not be published. Required fields are marked *